South Western Vehicle Auctions required a large-scale scaffolding installation to support the deployment of a 69.6kW solar panel system across their commercial premises at Holton Heath Trading Estate. With the building measuring approximately 55 metres in length and 10 metres to the ridge, the scaffolding structure needed to provide safe rooftop access for engineers while ensuring all fire exits, delivery shutters, and general entrances remained fully operational throughout the works. As an active auction site, maintaining uninterrupted business operations was essential.