Case Study, 180 Degrees, Southbourne, Block B
Block B Loading Bay at 180 Degrees, Southbourne
Up Top Scaffolding completed the erection of the Block B loading bay at 180 Degrees in Southbourne, marking another key stage in the development.
- Service
- Scaffold loading bay
- Location
- 180 Degrees, Southbourne, Block B
01 What we did
Loading bay built directly from the approved design drawings.
Careful planning and coordination throughout the works to erect the structure safely and efficiently.
A focus on precision, quality and safety from design drawing to finished structure.
02 Project gallery
Other work from the team
Bournemouth East Cliff Hotel Scaffolding: Phase 1
View case study
Bournemouth Oceanarium Scaffolding
View case study